ABOUT
Over 20 years of experience in Sterile, Biological Pharmaceutical and Hospital Facilities Engineering Design, Construction and Validation.
Social Networks
Newsletter
Blog - Pharmaceutical HVAC
Pharmaceutical HVAC focused blog. Design, construction and validation
pharmaceutical, hvac, design, construction, validation
599
paged,page-template,page-template-blog-masonry-date-in-image,page-template-blog-masonry-date-in-image-php,page,page-id-599,paged-3,page-paged-3,bridge-core-2.2.7,ajax_fade,page_not_loaded,,side_area_uncovered_from_content,hide_top_bar_on_mobile_header,qode-theme-ver-21.4,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-6.4.1,vc_responsive
 

Blog

Low temperature cleanroom design challenges and key points to consider: avoid condensation, stratification and energy-related issues....

Commissioning is defined as a quality-oriented process for verifying and documenting that the performance of facilities, systems and assemblies meets defined objectives and...

An important detail to consider when installing an Air Handling Unit (AHU) is the condensate drains. This consideration is not always followed and...

Cleanroom air balance calculation. Air flows considerations to completely define cleanroom HVAC....