ABOUT
Over 20 years of experience in Sterile, Biological Pharmaceutical and Hospital Facilities Engineering Design, Construction and Validation.
Social Networks
Newsletter
Plasma Industries Belgium - Pharmaceutical HVAC
16248
portfolio_page-template-default,single,single-portfolio_page,postid-16248,bridge-core-2.2.7,ajax_fade,page_not_loaded,,side_area_uncovered_from_content,hide_top_bar_on_mobile_header,qode-theme-ver-21.4,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-6.4.1,vc_responsive
 

Plasma Industries Belgium

About This Project

In order to create extra fractionation capacity, a new expansion area was designed and constructed. The new cleanroom area included the installation of 4 additional fractionation vessels, 2 rinse vessels, and 4 buffer vessels. In the project scope, there was an additional cold room (5 degC) grade C to allocate a filter press.

 

Three air handling units were successfully installed and commissioned. The project was completed with the increase of the glycol production plant with a new ammonia compressor and water condensing unit.

 

https://www.plasma-industries.be/website/about-us/

Date
Category
Projects
Tags
Plasma Industries Belgium Fractionation
No Comments

Post A Comment