The scope of this project was to build a new albumin purification & filling facility with manufacturing capacity to produce 6 MM litres/year of equivalent plasma or approximately 130-150 MMg of Albumin/year.
The plant is located at Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22 site. This project was developed on the north part of the site where the warehouse, packaging areas, lab spaces and office spaces of Grifols were existing.
The facility houses the following areas:
Production area to perform the Fr V suspension and albumin purification up to the final sterile bulk filtration.
Production area to perform the albumin aseptic filling process
Mechanical/Technical areas for the required equipment to perform the previous two processes.
Utility generation, storage and distribution areas
Connecting corridor to the existing warehouse building for the raw materials, disposables and goods delivery.
Quality control lab to perform the biological and physical and chemical required analytical processes and tests
Future office space
Sorry, the comment form is closed at this time.