The Project Orca is developed in a brownfield site in Visp, Switzerland. This site provides additional manufacturing capacity for the Lonza GMP Manufacturing facility in the Ibex Biopark. The facility is to be focused on products derived from mammalian cell culture for bulk drug products...

  Design of two new Fill & Finish suites based on freeze-drying technologies to increase production capacity in Wavre, Belgium. The facility is expected to be multi-products and compliant with cGMP guidelines for the Korean FDA, US FDA, EU GMP, PIC/S, Japan PMDA and Chinese.   The two...

  Biologics INnovation Xceleration (BioNX) facility, Dunboyne, Ireland site, designed for leveraging co-location of registration and launch to accelerate commercialization of biologics.   OSM (Off-Site Manufacturing) strategy project.  ...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_empty_space][vc_column_text]OPS1 facility at MSD, Ireland (Brinny). The upgraded facility will be dedicated to filling vaccine V160 for the prevention of CMV infections. The project consists of retrofit and upgrade of an existing sterile production Suite for BSL2 containment, and...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]   Building (Approx. 1300 m2 x 3 levels) to increase Grifols Plasma Fractionation capacity.   Building capacity: 2,000,000 Liters/year (40/52 weeks/year 24/7).   Installation of 18 various sizes fusion reactors, 3 centrifuges and 3 press filters.   Semi-dedicated interconnection approach with minimum transfer pannels.   -30 deg...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Basic engineering project of a new pilot plant for the influenza vaccine, in the facilities that Sinergium Biotech has in the municipality of Garín, Buenos Aires, Argentina. The production forecast is to carry out batches of 200 litres...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]The Alfa-1 Antitrypsin building, in Parets del Vallès, Barcelona, Spain, has a floor area of ​​approximately 2,410 m2 and has a ground floor and two lower floors below deck and an exterior platform for equipment for production systems...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]The scope of this project was to build a new albumin purification & filling facility with manufacturing capacity to produce 6 MM litres/year of equivalent plasma or approximately 130-150 MMg of Albumin/year.   The plant is located at Grange Castle...